Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Berlin - Brandenburg Airport Center | office building, new construction | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Architektengruppe GHP Client: Fay Projects GmbH |
10.670 m² | 2011 - 2012 | ![]() |
lecture hall psychological university Berlin | public building, new construction | plaster on gypsum board, plaster on gypsum board, brickwork, concrete | Germany, Berlin | Architect: a-base Büro für Architektur, Berlin |
225 m² | 2015 | ![]() |
Qatar Embassy | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Berlin | Architect: John S. Bonnington & Architekturbüro Duane Phillips Client: Emirat Katar |
723 m² | 2000 - 2004 | ![]() |
Reichstag Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Foster + Partners Client: Federal Republic of Germany |
7.000 m² | 1995 - 1999 | ![]() |
Visitor & Training Center Karl Storz Berlin | public building, refurbishment | plaster on concrete, floor heating onto screed, wooden or drywall subfloor, plaster on gypsum board, brickwork, concrete, floor heating in screed | Germany, Berlin | Architect: Felix Aries Client: Karl Storz SE & Co. KG |
6.900 m² | 2012 - 2014 | ![]() |
Revitalisation Wilhelmsplatz 16 Offenbach | residential building, refurbishment | plaster on gypsum board, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Offenbach | Architect: Gronych + Dollega Architekten |
620 m² | 2017 | ![]() |
Children's Hospital Augsburg | clinic, new construction | jointless drywall ceiling with CTM placed on top | Germany, Augsburg | Architect: LUDES Architekten - Ingenieure GmbH Client: Hospital Augsburg |
1.140 m² | 2013 - 2014 | ![]() |
Ultra modern office building BV Eberl Plattling | office building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Plattling | Architect: Klaus Knörich |
1.267 m² | 2015 | ![]() |
Brandenburg State Parliament Potsdam | public building, refurbishment | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Potsdam | Architect: Prof. Peter Kulka Client: State Brandenburg |
7.630 m² | 2010 - 2013 | ![]() |
Residential complex Havelwelle Potsdam | residential building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Potsdam | Architect: Flender & Drobig Architekten GmbH Client: Krause Bauträger-Holding GmbH |
6.280 m² | 2018 - 2019 | ![]() |
Oberlin Rehaklinik "Hoher Fläming" Bad Belzig | clinic, refurbishment | floor heating onto screed, wooden or drywall subfloor | Germany, Bad Belzig | 289 m² | 2012 | ![]() |
|
Heinrichstift Luckenwalde - Wohnkonzept 50life Luckenwalde | residential building, refurbishment | floor heating onto screed, wooden or drywall subfloor | Germany, Luckenwalde | 2.518 m² | 2013 - 2017 | ![]() |
|
Hotel Im Wasserturm | Hotel in water tower Hamburg | hotel, refurbishment | plaster on concrete | Germany, Hamburg | Architect: Falk von Tettenborn |
2.658 m² | 2006 | ![]() |
Drehhaus Rinn | Rotating House Heuchelheim | residential building, new construction | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Heuchelheim | Architect: Gronych + Dollega Architekten Client: Petra und Christopher Rinn |
202 m² | 2019 - 2021 | ![]() |
Alte Schmiede Ottersburg Tangerhütte | public building | floor heating onto screed, wooden or drywall subfloor, floor heating in screed, plaster on gypsum board, brickwork, concrete | Germany, Tangerhütte | 231 m² | 2016 | ![]() |
|
Haecker Metall Pforzheim | office building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Pforzheim | Architect: SCAILAB Fiess Kruse Freie Architekten GbR |
635 m² | 2017 | ![]() |
Frauenkirche in Meißen | Church | public building, refurbishment | plaster on gypsum board, brickwork, concrete, plaster on concrete, floor heating in screed | Germany, Meißen | Architect: Architekturbüro Jürgen Singer |
304 m² | 2013 | ![]() |
Museum Ritter | Sammlung Marli Hoppe-Ritter Waldenbuch | public building, new construction | floor heating onto screed, wooden or drywall subfloor | Germany, Waldenbuch | Architect: Max Dudler Client: Alfred Ritter GmbH |
395 m² | 2005 | ![]() |
Angerkirche Potsdam | public building, refurbishment | plaster on gypsum board, brickwork, concrete, floor heating in screed | Germany, Potsdam | 65 m² | 2006 | ![]() |
|
Apartments Schivelbeinstraße Berlin | residential building | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Berlin | 210 m² | 2019 | ||
Bauhaus-Archive Berlin | public building, retrofit | drywall floating ceiling, metal floating ceiling | Germany, Berlin | 120 m² | 2009 | ||
BG Feinmechanik Berlin | office building, refurbishment | plaster on gypsum board | Germany, Berlin | 192 m² | 2006 | ||
Boathouse Villa Schwanenwerder Berlin | residential building, new construction | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Berlin | 121 m² | 2008 | ||
Charité Campus Mitte Berlin | clinic, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Berlin | 83 m² | 2014 | ||
Federal Foreign Office Berlin | office building | plaster on gypsum board, plaster on concrete | Germany, Berlin | 115 m² | 1997 | ||
Federal Ministry of Health Berlin | office building, modification and renovation | jointless gypsum board ceiling with OPTIPANEL 18, jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Berlin | Architect: KSP Engel GmbH, Berlin Client: Bundesanstalt für Immobilienaufgaben |
4.700 m² | 2021 - 2022 | |
Halenseestraße "Lemon" Berlin | office building, refurbishment | metal panel | Germany, Berlin | Architect: Léon Wohlhage Wernik Architekten GmbH |
1.050 m² | 2000 | |
Historical village forge Berlin | residential building, refurbishment | plaster on gypsum board, brickwork, concrete | Germany, Berlin | 164 m² | 2018 | ||
Kontorhaus Charlottenstr. 65 Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | 458 m² | 1999 | ||
KPM Quartier Berlin | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Berlin | Architect: Braun & Voigt und Heinle, Wischer und Partner und Suter & Suter |
4.474 m² | 2003 | |
LBB Alexanderhaus Umbau Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Architekturbüro Robert Client: Berliner Sparkasse |
33 m² | 2018 | |
Lenné 3 Offices at Tiergarten Berlin | office building, new construction | plaster on concrete | Germany, Berlin | Architect: Collignon Fischötter Architekten GmbH |
2.393 m² | 2002 - 2003 | |
Lenné 3 Offices at Tiergarten Berlin | office building, new construction | plaster on concrete | Germany, Berlin | Architect: SAA Schweger Architekten |
2.066 m² | 2002 | |
Lenné 5 Offices at Tiergarten Berlin | office building, new construction | plaster on concrete | Germany, Berlin | Architect: Collignon Fischötter Architekten GmbH |
2.494 m² | 2002 | |
Lenné 9 Exclusive office building Berlin | office building, new construction | plaster on concrete | Germany, Berlin | Architect: WEP Effinger & Partner |
1.744 m² | 2002 | |
Microsoft Center, Flagship Store Berlin | office building, refurbishment | plaster on gypsum board | Germany, Berlin | Architect: Aukett + Heese Frankfurt GmbH |
110 m² | 2013 | |
Otto Bock Science Center Medizintechnik | Medical Technology Center Berlin | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Berlin | Architect: Gnädinger Architekten |
852 m² | 2009 | |
Quartier 30 Berlin | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Berlin | 5.925 m² | 2000 - 2002 | ||
Renovation SFH Berlin Dahlem | residential building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete, floor heating in screed | Germany, Berlin | Client: private person |
85 m² | 2001 | |
Residential and commercial building Jägerstr. 34-35 Berlin | public building, new construction and refurbishment | plaster on gypsum board, plaster on concrete | Germany, Berlin | Architect: Wiegand & Hoffmann, Berlin Client: H.-J.+ G.S. |
544 m² | 2007 & 2014 | |
Residential and commercial building Karlplatz Berlin | residential building, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Berlin | 250 m² | 2001 | ||
Residential building Ruhlebener Straße Berlin | residential building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete | Germany, Berlin | 116 m² | 2020 | ||
Training centre SHK-Innung Berlin | public building | gypsum board ceiling tile, drywall floating ceiling | Germany, Berlin | 127 m² | 2015 | ||
Villa Schwanenwerder Berlin | residential building, new construction | plaster on gypsum board, floor heating in screed | Germany, Berlin | Architect: Architekturbüro GRAFT Berlin Client: private person |
1.800 m² | 2008 - 2009 | |
Refurbishment Art Nouveau House Luckenwalde | residential building, refurbishment | floor heating onto screed, wooden or drywall subfloor, plaster on gypsum board, brickwork, concrete | Germany, Luckenwalde | Architect: Architektur + Restaurierung, Luckenwalde Client: private person |
188 m² | 2014 - 2016 | |
AIRBUS Deutschland Hamburg | laboratory | special design | Germany, Hamburg | 38 m² | 2008 | ||
AIRBUS Operations Dept. EVCEA I Hamburg | laboratory | special design | Germany, Hamburg | 27 m² | 2015 | ||
AIRBUS Operations Dept. EVCEA II Hamburg | laboratory | special design | Germany, Hamburg | 161 m² | 2016 |