Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
ROLEX Learning Center Lausanne | public building, new construction | acoustic plaster ceiling BASWA Cool | Switzerland, Lausanne | Architect: Kazuyo Sejima und Ryue Nishizawa, SANAA Client: École Polytechnique Fédérale de Lausanne (CH) |
1.340 m² | 2007 - 2010 | ![]() |
Novartis Campus | Research and Administration Centre Basel | office building, refurbishment | acoustic plaster ceiling BASWA Cool, metal panel | Switzerland, Basel | Architect: Vittorio Magnago Lampugnani |
1.950 m² | 2007 - 2008 | |
Two generation house Rapperswil-Jona | residential building, new construction | plaster on concrete, floor heating in screed, plaster on gypsum board, brickwork, concrete | Switzerland, Rapperswil-Jona | Client: Privatperson |
430 m² | 2021 - 2022 | |
Renovation of a cheese dairy Randenhof Sibbling | industrial building, refurbishment | plaster on gypsum board, brickwork, concrete | Switzerland, Sibbling | Client: Privatperson |
74 m² | 2013 | |
AMAG Schinznach-Bad | office building | metal panel | Switzerland, Schinznach-Bad | 363 m² | 2005 | ||
Raiffeisenbank Tägerwilen | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Tägerwilen | 109 m² | 2005 | ||
Raiffeisenbank Frauenfeld | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Frauenfeld | 463 m² | 2005 | ||
Hotel Elite Biel | hotel | jointless drywall ceiling with CTM placed on top | Switzerland, Biel | 135 m² | 2005 | ||
Lindt & Sprüngli Chocolate factory Kilchberg | industrial building, refurbishment | plaster on gypsum board, plaster on concrete | Switzerland, Kilchberg | 652 m² | 2005 - 2006 | ||
Hewlett Packard Dübendorf | office building, refurbishment | metal panel | Switzerland, Dübendorf | 4.473 m² | 2006 | ||
Commercial and office building Rue du Rhône 80-84 Geneva | public building | plaster on gypsum board | Switzerland, Geneva | 3.094 m² | 2007 - 2008 & 2013 | ||
Gunvor Group Geneva | office building | jointless drywall ceiling with CTM placed on top | Switzerland, Geneva | 321 m² | 2010 | ||
Office Balzane Services Rue du Rhone 50 Geneva | office building, refurbishment | plaster on gypsum board | Switzerland, Geneva | 382 m² | 2015 & 2020 | ||
Office building Rue du Rhône 80-84 Geneva | office building | plaster on concrete | Switzerland, Geneva | 215 m² | 2006 | ||
ROLEX Geneva | office building | jointless drywall ceiling with CTM placed on top | Switzerland, Geneva | 657 m² | 2006 | ||
Raiffeisenbank Wittenbach | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Wittenbach | 333 m² | 2006 | ||
Nestlé Vevey | office building | metal panel | Switzerland, Vevey | 131 m² | 2006 | ||
Seminar Center Solothurn | public building | floor heating in screed | Switzerland, Solothurn | 298 m² | 2006 | ||
BCV Banque Cantonale Vaudoise | Lausanne | office building, refurbishment | plaster on concrete, plaster on gypsum board | Switzerland, Lausanne | 111 m² | 2020 | ||
Intern. Federation for Equestrian Sports Lausanne | office building | plaster on gypsum board | Switzerland, Lausanne | 1.618 m² | 2010 | ||
Villa Mazurya Lausanne | residential building | plaster on gypsum board | Switzerland, Lausanne | 354 m² | 2006 | ||
AMAG Crissier | public building | metal panel | Switzerland, Crissier | 336 m² | 2006 | ||
Caisse de Retraite de Plurigestion SA Sion | office building | plaster on concrete | Switzerland, Sitten | 220 m² | 2007 | ||
Cantonal Compensation Office Wallis Sion | office building | plaster on concrete, jointless drywall ceiling with CTM placed on top | Switzerland, Sitten | 831 m² | 2011 & 2013 & 2016 | ||
ICHV Sion | Institute Central Des Hôpitaux Sion | laboratory, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Sitten | 161 m² | 2019 | ||
Nespresso Call Center Sion | office building | metal panel | Switzerland, Sitten | 1.288 m² | 2007 | ||
SUVA Klinik CRR Sion | clinic, new construction | metal panel, plaster on concrete, jointless drywall ceiling with CTM placed on top | Switzerland, Sitten | 1.856 m² | 2014 - 2015 | ||
Multi-family house BIE Oberbuchsiten | residential building | floor heating onto screed, wooden or drywall subfloor | Switzerland, Oberbuchstein | 610 m² | 2007 - 2008 | ||
Villa Les Cèdres Martingny | residential building, refurbishment | acoustic plaster ceiling BASWA Cool | Switzerland, Martigny | 222 m² | 2007 | ||
BMW Sauber AG, Atrium Hinwil | public building | floor heating onto screed, wooden or drywall subfloor | Switzerland, Hinwil | 436 m² | 2007 | ||
Villa Rte de Lausanne Chambésy | residential building, refurbishment | plaster on concrete | Switzerland, Chambésy | 380 m² | 2007 | ||
GWG Triumph International Bad Zurzach | office building | metal panel, plaster on gypsum board, plaster on concrete | Switzerland, Bad Zurzach | 889 m² | 2007 | ||
Mission of the Republic of Singapore Châtelaine-Genève | public building | plaster on concrete | Switzerland, Châtelaine-Genf | 398 m² | 2006 - 2007 | ||
ROCHE BSN - building 10 Basel | office building | acoustic plaster ceiling BASWA Cool | Switzerland, Basel | Architect: Herzog & de Meuron |
518 m² | 2016 | |
Volksbank Bodensee Basel | office building | plaster on concrete, jointless drywall ceiling with CTM placed on top | Switzerland, Basel | 557 m² | 2008 - 2009 | ||
Raiffeisenbank Unteres Rheintal St. Margrethen | office building | plaster on concrete | Switzerland, St. Margrethen | 444 m² | 2008 | ||
Residence Ermitage at Lake Zurich Kusnacht | residential building | plaster on concrete | Switzerland, Küsnacht | Architect: MPK Architekten AG |
383 m² | 2009 | |
Villa Goldbach Kusnacht | residential building | plaster on gypsum board | Switzerland, Küsnacht | 481 m² | 2009 | ||
Emil Frey AG Erlenbach | public building | plaster on concrete | Switzerland, Erlenbach | 292 m² | 2009 | ||
Parish St. Maria Schaffhausen | public building, refurbishment | metal panel | Switzerland, Schaffhausen | 134 m² | 2012 | ||
House 2 Fluhweg Buchs | residential building | plaster on gypsum board | Switzerland, Buchs | 212 m² | 2013 | ||
SUVA Insurance St. Gallen | office building | acoustic plaster ceiling BASWA Cool | Switzerland, St. Gallen | 243 m² | 2014 | ||
Hospital Centre Obewallis Brig | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Brig | 156 m² | 2014 | ||
Hospital Centre Oberwallis Visp | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Visp | 218 m² | 2015 | ||
Spitalzentrum Oberwallis | dialysis centre Visp | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Visp | 126 m² | 2020 | ||
BASWA- acoustic AG - Center of Learning Baldegg | public building | acoustic plaster ceiling BASWA Cool | Switzerland, Baldegg | 28 m² | 2016 | ||
UBS Bank Sierre | office building | plaster on concrete | Switzerland, Sierre | 183 m² | 2017 | ||
Spar- und Leihkasse Frutigen | Savings and Loan Association | public building | acoustic plaster ceiling BASWA Cool | Switzerland, Frutigen | 78 m² | 2017 |