Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Berlin - Brandenburg Airport Center | office building, new construction | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Architektengruppe GHP Client: Fay Projects GmbH |
10.670 m² | 2011 - 2012 | |
Reichstag Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Foster + Partners Client: Federal Republic of Germany |
7.000 m² | 1995 - 1999 | |
Revitalisation Wilhelmsplatz 16 Offenbach | residential building, refurbishment | plaster on gypsum board, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Offenbach | Architect: Gronych + Dollega Architekten |
620 m² | 2017 | |
Children's Hospital Augsburg | clinic, new construction | jointless drywall ceiling with CTM placed on top | Germany, Augsburg | Architect: LUDES Architekten - Ingenieure GmbH Client: Hospital Augsburg |
1.140 m² | 2013 - 2014 | |
Ultra modern office building BV Eberl Plattling | office building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Plattling | Architect: Klaus Knörich |
1.267 m² | 2015 | |
Brandenburg State Parliament Potsdam | public building, refurbishment | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Potsdam | Architect: Prof. Peter Kulka Client: State Brandenburg |
7.630 m² | 2010 - 2013 | |
Residential complex Havelwelle Potsdam | residential building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Potsdam | Architect: Flender & Drobig Architekten GmbH Client: Krause Bauträger-Holding GmbH |
6.280 m² | 2018 - 2019 | |
Drehhaus Rinn | Rotating House Heuchelheim | residential building, new construction | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Heuchelheim | Architect: Gronych + Dollega Architekten Client: Petra und Christopher Rinn |
202 m² | 2019 - 2021 | |
Haecker Metall Pforzheim | office building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Pforzheim | Architect: SCAILAB Fiess Kruse Freie Architekten GbR |
635 m² | 2017 | |
Apartments Schivelbeinstraße Berlin | residential building | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Berlin | 210 m² | 2019 | ||
Boathouse Villa Schwanenwerder Berlin | residential building, new construction | jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Berlin | 121 m² | 2008 | ||
Federal Ministry of Health Berlin | office building, modification and renovation | jointless gypsum board ceiling with OPTIPANEL 18, jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Berlin | Architect: KSP Engel GmbH, Berlin Client: Bundesanstalt für Immobilienaufgaben |
4.700 m² | 2021 - 2022 | |
Kontorhaus Charlottenstr. 65 Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | 458 m² | 1999 | ||
LBB Alexanderhaus Umbau Berlin | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Architekturbüro Robert Client: Berliner Sparkasse |
33 m² | 2018 | |
Otto Bock Science Center Medizintechnik | Medical Technology Center Berlin | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Berlin | Architect: Gnädinger Architekten |
852 m² | 2009 | |
Quartier 30 Berlin | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Berlin | 5.925 m² | 2000 - 2002 | ||
Training centre SHK-Innung Berlin | public building | gypsum board ceiling tile, drywall floating ceiling | Germany, Berlin | 127 m² | 2015 | ||
Revitalisation of an office and commercial building Kreuslerstraße Hamburg | office building, refurbishment | plaster on gypsum board, jointless drywall ceiling with CTM placed on top | Germany, Hamburg | Architect: Florian Fischötter Architekt GmbH Client: St. Petri Hof Immobilien Verwaltungs GmbH |
597 m² | 2017 | |
Henry Kruse GmbH IGEFA Neumünster | industrial building, new construction | gypsum board ceiling tile | Germany, Neumünster | Client: Kruse Immobilien GmbH |
1.666 m² | 2016 | |
Schlaues Haus | Smart House Oldenburg | public building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Oldenburg | Architect: Behnisch Architekten, Stuttgart |
387 m² | 2012 | |
"The LOK" BUTTING Wittingen | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Wittingen | Architect: Gräflich + Monard Architekten Client: Butting Gruppe |
886 m² | 2016 | |
Lower Saxony State Parliament Cupola Hannover | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Hannover | Client: Staatliches Baumanagement Hannover |
70 m² | 2016 | |
BDH-Klinik Braunfels | clinic, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top | Germany, Braunfels | 1.364 m² | 2015 & 2019 | ||
Bethesda Ärztezentrum | Medical Centre Mönchengladbach | social and medical institutions, new construction | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top | Germany, Mönchengladbach | Architect: Ledwig + Spinnen |
3.880 m² | 2013 & 2014 | |
New office building Schauinsland-Reisen Duisburg | office building, new construction | plaster on concrete, metal panel, jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Duisburg | Client: Schauinsland-Reisen |
2.576 m² | 2017 | |
EuroNova Loftmeile | Building 3, 4, 6 Cologne | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Cologne | 857 m² | 2010 - 2012 | ||
RheinEnergie AG main building Cologne | office building, new construction | plaster on concrete, metal panel, jointless drywall ceiling with CTM placed on top, jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Cologne | Architect: Sinning Architekten |
29.400 m² | 2012 - 2014 | |
Rheinpalais Cologne | office building, new construction and refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Cologne | Architect: Valentyn Architekten |
1.060 m² | 2007 - 2008 | |
Stadtwerke Aachen | Municipial Utilities | office building | jointless drywall ceiling with CTM placed on top | Germany, Aachen | 151 m² | 2011 | ||
New office building and warehouse Strabag Düren | office building, new construction | jointless drywall ceiling with CTM placed on top, plaster on concrete | Germany, Düren | Architect: Dirk Niehsen Architektur |
638 m² | 2020 - 2022 | |
Neuer Markt Ingelheim am Rhein | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Ingelheim/Rhein | Architect: Schwinde Architekten, Lieb und Lieb Architekten |
2.251 m² | 2016 | |
Hochschule der BA für Arbeit Mannheim | public building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Mannheim | Client: BI Management GmbH, Nürnberg |
217 m² | 2016 - 2017 | |
ALB 10 Züblin corporate headquarter Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Client: STRABAG Real Estate GmbH |
3.543 m² | 2021 - 2022 | |
Magirus Immbobiliengesellschaft Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Architect: Blocher Partners |
1.914 m² | 2018 | |
Bayerische Landesbank Munich | office building, refurbishment | jointless drywall ceiling with CTM placed on top, plaster on gypsum board, plaster on concrete | Germany, Munich | 4.134 m² | 2008 - 2009 | ||
Single family home with swimming pool Gars am Inn | residential building, new construction | jointless gypsum board ceiling with OPTIPANEL 15, floor heating in screed, surface collector, facade absorber | Germany, Gars am Inn | Client: private person |
746 m² | 2016 | |
New construction Mikroskopgebäude SALVE + TITAN Ulm | laboratory, new construction | gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 | Germany, Ulm | Architect: Mühlich, Finke & Partner Client: Vermögen und Bau Baden-Württemberg |
216 m² | 2017 | |
Klinikum Bamberg | clinic, new construction | jointless drywall ceiling with CTM placed on top | Germany, Bamberg | Architect: LUDES Architekten - Ingenieure GmbH Client: Sozialstiftung Bamberg |
3.595 m² | 2018 - 2019 | |
Siemens AG Görlitz | Hall 7 Görlitz | industrial building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Gorlitz | 1.545 m² | 2006 - 2007 | ||
WHZ Zwickau | Historische Fahrzeughalle | public building | jointless drywall ceiling with CTM placed on top | Germany, Zwickau | 332 m² | 2008 | ||
Bayer Pharma AG Building M004 | office building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Berlin | 582 m² | 2016 | ||
Bayer Schering Pharma AG | office building, refurbishment | gypsum board ceiling tile | Germany, Berlin | 1.072 m² | 2010 | ||
Berliner Bau- u. Wohnungsgenossenschaft 1892 Berlin | office building, refurbishment | plaster on gypsum board, jointless drywall ceiling with CTM placed on top | Germany, Berlin | 104 m² | 2009 | ||
Deutsche Telekom Representative Office Berlin | office building, new construction , , refurbishment | metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Germany, Berlin | 1.980 m² | 2001 | ||
Galvanistraße 10 Berlin | residential building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Berlin | 72 m² | 2020 | ||
Hofgebäude Brunnenstrasse Berlin | residential building, new construction | floor heating in screed, jointless gypsum board ceiling with OPTIPANEL 15, roof absorber, ground collector | Germany, Berlin | Architect: Cubus Plan GmbH Client: private person |
251 m² | 2015 | |
IT-Dienstleistungszentrum ITDZ Berlin house 3 | office building | gypsum board ceiling tile | Germany, Berlin | 767 m² | 2021 - 2022 | ||
KBV National Association of Statutory Health Insurance Physicians Berlin | office building, new construction | jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Berlin | 147 m² | 2011 |