Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Casino Mondorf-les-Bains | public building, refurbishment | special design, gypsum board ceiling | Luxembourg, Mondorf-les-Bains | 111 m² | 2011 | ||
Palace Liechtenstein Vienna | public building, refurbishment | metal panel, gypsum board ceiling tile | Austria, Vienna | Architect: Wehdorn Architekten Client: Prince of Liechtenstein Foundation |
664 m² | 2007 - 2012 | |
Brandenburg State Parliament Potsdam | public building, refurbishment | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Potsdam | Architect: Prof. Peter Kulka Client: State Brandenburg |
7.630 m² | 2010 - 2013 | |
Otto Bock Science Center Medizintechnik | Medical Technology Center Berlin | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Berlin | Architect: Gnädinger Architekten |
852 m² | 2009 | |
Training centre SHK-Innung Berlin | public building | gypsum board ceiling tile, drywall floating ceiling | Germany, Berlin | 127 m² | 2015 | ||
Schlaues Haus | Smart House Oldenburg | public building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Oldenburg | Architect: Behnisch Architekten, Stuttgart |
387 m² | 2012 | |
Neuer Markt Ingelheim am Rhein | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Ingelheim/Rhein | Architect: Schwinde Architekten, Lieb und Lieb Architekten |
2.251 m² | 2016 | |
Hochschule der BA für Arbeit Mannheim | public building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Mannheim | Client: BI Management GmbH, Nürnberg |
217 m² | 2016 - 2017 | |
WHZ Zwickau | Historische Fahrzeughalle | public building | jointless drywall ceiling with CTM placed on top | Germany, Zwickau | 332 m² | 2008 | ||
German Embassy Paris | public building | jointless gypsum board ceiling with OPTIPANEL 25 | France, Paris | 250 m² | 2017 | ||
Liverpool Philharmonic Hall | public building, refurbishment | jointless drywall ceiling with CTM placed on top | United Kingdom, Liverpool | 113 m² | 2014 | ||
St. Annes College Library Oxford | public building, new construction | jointless drywall ceiling with CTM placed on top | United Kingdom, Oxford | 732 m² | 2016 | ||
Mairie deBertrange| townhall | public building | jointless drywall ceiling with CTM placed on top | Luxembourg, Bertrange | 529 m² | 2010 | ||
New town hall | Mondorf-les-Bains | public building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Luxembourg, Mondorf-les-Bains | Architect: Coeba architecture, urbanisme & design, Bereldange, Luxemburg |
810 m² | 2011 | |
CPU Jail Ürschterhaff Sanem | public building, new construction | jointless drywall ceiling with CTM placed on top | Luxembourg, Sanem | 195 m² | 2019 | ||
Priva B. V. De Lier | public building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Netherlands, De Lier | 393 m² | 2014 | ||
BVA training center Vienna | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18, plaster on concrete, jointless gypsum board ceiling with OPTIPANEL 15 | Austria, Vienna | 136 m² | 2018 | ||
WiFi Center for Continuing Education Linz | public building | jointless drywall ceiling with CTM placed on top, metal panel | Austria, Linz | 1.469 m² | 2010 | ||
Concert Hall Erl | public building, new construction | jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Austria, Erl / Tyrol | Architect: Delugan Meissl Associated Architects |
1.550 m² | 2012 | |
Raiffeisenbank Tägerwilen | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Tägerwilen | 109 m² | 2005 | ||
Raiffeisenbank Frauenfeld | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Frauenfeld | 463 m² | 2005 | ||
Raiffeisenbank Wittenbach | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Wittenbach | 333 m² | 2006 | ||
Bank Sparhafen Zurich | public building | jointless drywall ceiling with CTM placed on top | Switzerland, Zurich | 362 m² | 2006 | ||
FSC Shop Santa Ponsa Mallorca | public building | jointless drywall ceiling with CTM placed on top | Spain, Santa Ponsa / Mallorca | 132 m² | 2013 | ||
Fundación Victor Sastre El Barraco Avila | public building | ground collector, floor heating in screed, jointless drywall ceiling with CTM placed on top | Spain, El Barraco Avila | Client: Privatperson |
303 m² | 2010 - 2011 | |
Maschari Center Berlin | Moschee Berlin | public building, new construction | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Berlin | Architect: Günter Barnstedt |
1.233 m² | 2006 | |
VB Lüneburger Heide - Salzhausen | public building | jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Salzhausen | 587 m² | 2020 - 2021 | ||
Educational Centre Itzehoe | public building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Itzehoe | 199 m² | 2014 | ||
Pharmacy Bünde | public building | GRAVIMAT, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Bünde | 180 m² | 2020 | ||
Theater Gütersloh | public building | plaster on gypsum board, jointless drywall ceiling with CTM placed on top | Germany, Gütersloh | 776 m² | 2009 | ||
Philipps-Universität Marburg | public building | jointless drywall ceiling with CTM placed on top | Germany, Marburg | 79 m² | 2010 | ||
ALDI in Mönchengladbach Arcaden MINTO | public building, new construction | gypsum board ceiling tile | Germany, Mönchengladbach | 410 m² | 2014 | ||
ALDI-Markt Hennes-Weiler-Allee Mönchengladbach | public building | gypsum board ceiling tile | Germany, Mönchengladbach | Architect: bdmp | Architekten GmbH & Co. KG |
345 m² | 2014 | |
ALDI-Markt Hofstraße Mönchengladbach | public building | gypsum board ceiling tile | Germany, Mönchengladbach | 129 m² | 2012 | ||
TU Dortmund - Mensa Dortmund | public building | jointless drywall ceiling with CTM placed on top | Germany, Dortmund | 217 m² | 2012 | ||
Bürgeramt Mühlheim/Ruhr | public building | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Mühlheim a.d.Ruhr | 656 m² | 2006 | ||
Central Auditorium PPS, RWTH Aachen | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Aachen | Architect: HH+F Architekten Hentrup Heyers + Prof. Fuhrmann |
579 m² | 2012 | |
Oberlandesgericht Hamm | Higher Regional Court | public building | jointless drywall ceiling with CTM placed on top | Germany, Hamm | 264 m² | 2003 | ||
FH Erfurt | New Construction Auditorium & Laboratory | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Erfurt | 1.371 m² | 2011 | ||
Energetic refurbishment Staatsarchiv Dresden | State Archives Dresden | public building, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | Architect: Schweger Associated Architects GmbH |
803 m² | 2010 - 2011 | |
Trade school centre Vogtland Rodewisch | public building | jointless drywall ceiling with CTM placed on top | Germany, Rodewisch | 102 m² | 2003 | ||
Archiv Potsdam | public building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Potsdam | 307 m² | 2014 | ||
Hasso Plattner Institute | extension building Potsdam | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Potsdam | 479 m² | 2010 | ||
The Brandenburg main state archive Potsdam | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Potsdam | 444 m² | 2015 |