Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Palace Liechtenstein Vienna | public building, refurbishment | metal panel, gypsum board ceiling tile | Austria, Vienna | Architect: Wehdorn Architekten Client: Prince of Liechtenstein Foundation |
664 m² | 2007 - 2012 | |
Atelier Rieder Maishofen | public building | ice storage, floor heating onto screed, wooden or drywall subfloor | Austria, Maishofen | 108 m² | 2012 | ||
BVA training center Vienna | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18, plaster on concrete, jointless gypsum board ceiling with OPTIPANEL 15 | Austria, Vienna | 136 m² | 2018 | ||
Dania Showroom Vienna | public building, refurbishment | floor heating onto screed, wooden or drywall subfloor, acoustic plaster ceiling BASWA Cool, acoustic plaster wall BASWA Cool | Austria, Vienna | 124 m² | 2019 | ||
Raiffeisen Bausparkasse Vienna | public building | metal panel | Austria, Vienna | 3.080 m² | 2004 - 2005 | ||
WiFi Center for Continuing Education Linz | public building | jointless drywall ceiling with CTM placed on top, metal panel | Austria, Linz | 1.469 m² | 2010 | ||
University of Applied Sciences Wels | public building | metal panel | Austria, Wels | 2.387 m² | 2004 | ||
Concert Hall Erl | public building, new construction | jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Austria, Erl / Tyrol | Architect: Delugan Meissl Associated Architects |
1.550 m² | 2012 |