Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Exhaust air heat exchanger Conti tyre plant Hannover | industrial building, retrofit | heat exchanger | Germany, Hannover | 472 m² | 2008 | ||
Heat recovery waste water plant Münster | industrial building | heat exchanger | Germany, Muenster | 62 m² | 2015 | ||
Single family home with swimming pool Gars am Inn | residential building, new construction | jointless gypsum board ceiling with OPTIPANEL 15, floor heating in screed, surface collector, facade absorber | Germany, Gars am Inn | Client: private person |
746 m² | 2016 | |
WHZ | Heat Exchanger in mine drainage water Zwickau | public building | heat exchanger | Germany, Zwickau | 528 m² | 2017 | ||
heat recovery from a stable Gera | industrial building, retrofit | heat exchanger | Germany, Gera | 44 m² | 2008 | ||
Dialyse Centre Berlin | social and medical institutions, refurbishment | ground collector | Germany, Berlin | 240 m² | 2003 | ||
Hofgebäude Brunnenstrasse Berlin | residential building, new construction | floor heating in screed, jointless gypsum board ceiling with OPTIPANEL 15, roof absorber, ground collector | Germany, Berlin | Architect: Cubus Plan GmbH Client: private person |
251 m² | 2015 | |
Single-family house Negast | residential building, new construction | ground collector | Germany, Negast | 160 m² | 2011 | ||
Altin ground collector Lübeck | residential building | ground collector | Germany, Lübeck | 176 m² | 2010 & 2011 | ||
Kulturwerft Gollan Lübeck | industrial building, refurbishment | ground collector | Germany, Lübeck | 128 m² | |||
Residential building Römerweg Stelzenberg | residential building | ground collector | Germany, Stelzenberg | 160 m² | 2020 |