Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
SUVA Klinik CRR Sion | clinic, new construction | metal panel, plaster on concrete, jointless drywall ceiling with CTM placed on top | Switzerland, Sitten | 1.856 m² | 2014 - 2015 | ||
Hospital Centre Obewallis Brig | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Brig | 156 m² | 2014 | ||
Hospital Centre Oberwallis Visp | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Visp | 218 m² | 2015 | ||
Spitalzentrum Oberwallis | dialysis centre Visp | clinic, refurbishment | jointless drywall ceiling with CTM placed on top | Switzerland, Visp | 80 m² | 2020 | ||
Spital Thusis | clinic | metal panel | Switzerland, Thusis | 134 m² | 2018 |