Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Hotel Im Wasserturm | Hotel in water tower Hamburg | hotel, refurbishment | plaster on concrete | Germany, Hamburg | Architect: Falk von Tettenborn |
2.658 m² | 2006 | ![]() |
Hotel Van der Valk Eemnes | hotel, new construction | near-surface concrete activation | Netherlands, Eemnes | 741 m² | 2010 | ||
Belsen Parkhotel Düsseldorf-Oberkassel | hotel, new construction | plaster on concrete | Germany, Düsseldorf | Architect: AJF und Partner Client: CB Oberkassel GmbH |
2.375 m² | 2018 - 2020 | |
Parkhotel Bad Aibling | hotel, refurbishment | plaster on gypsum board, brickwork, concrete, floor heating in screed | Germany, Bad Aibling | Architect: Dipl.-Ing. Henner Oppermann |
732 m² | 2008 | |
Gutshaus Neuendorf | Usedom | hotel, refurbishment | plaster on gypsum board, brickwork, concrete | Germany, Lütow | Client: Ziegler |
623 m² | 2004 | |
Royal Olympic Hotel Athen | hotel, refurbishment | floor heating in screed | Greece, Athens | Client: private person |
430 m² | 2007 | |
Core Resorts Hotel Polichrono Chalkidiki | hotel | jointless drywall ceiling with CTM placed on top | Greece, Chalkidiki | Client: Core Hotels Ltd |
87 m² | 2011 | |
Concorde Hotel London | hotel, refurbishment | plaster on gypsum board | United Kingdom, London | 69 m² | 2008 | ||
Wellington Hotel, Westminster London | hotel, refurbishment | plaster on gypsum board | United Kingdom, London | 300 m² | 2013 | ||
Maids Head Hotel Norwich | hotel, refurbishment | plaster on concrete | United Kingdom, Norwich | 913 m² | 2014 - 2016 | ||
Hotel Muchele Wine tasting Meran | hotel | plaster on gypsum board, plaster on gypsum board, brickwork, concrete | Italy, Burgstall / Meran | Architect: Architekten Marx/Ladurner Client: Hotel Muchele KG, Burgstall/Meran |
58 m² | 2015 | |
Hotel Landgoed Zonheuvel and Conference Center Doorn | hotel | near-surface concrete activation, plaster on gypsum board, plaster on concrete | Netherlands, Doorn | 1.125 m² | 2010 | ||
Zorghotel De Nieuwe Basis Doorn | hotel | near-surface concrete activation | Netherlands, Doorn | 1.117 m² | 2012 - 2013 | ||
Hotel Sans Souci Vienna | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Austria, Vienna | 963 m² | 2012 | ||
Vienna Marriott Hotel | hotel | jointless drywall ceiling with CTM placed on top | Austria, Vienna | 188 m² | 2014 | ||
Chalet Alpenrose Ramsau | hotel, refurbishment | facade absorber, wall absorber, ice storage | Austria, Ramsau | 153 m² | 2013 | ||
Grand Hotel Balvanyos | hotel | plaster on concrete, floor heating in screed | Romania, Balvanyos | 1.033 m² | 2014 - 2015 | ||
Spa and Hotel Lobogo Homorod | hotel | plaster on concrete, floor heating onto screed, wooden or drywall subfloor | Romania, Hamruden | 360 m² | 2017 | ||
Leninsk Hotel | hotel, new construction | plaster on gypsum board, GRAVIMAT | Russia, Leninsk | 796 m² | 2018 | ||
Hotel Elite Biel | hotel | jointless drywall ceiling with CTM placed on top | Switzerland, Biel | 135 m² | 2005 | ||
Hotel HASA Prague | hotel, refurbishment | plaster on gypsum board | Czech Republic, Prague | 264 m² | 2010 | ||
Superior Hotel Löverek Sopran | hotel | plaster on concrete | Hungary, Sopran | 455 m² | 2005 | ||
Bal Harbour Hotel Miami Beach | hotel | jointless drywall ceiling with CTM placed on top, floor heating in screed | USA, Miami Beach, FL | 344 m² | 2010 | ||
Hotel Iveria Inn Tbilisi | hotel | plaster on gypsum board | Georgia, Tbilisi | 512 m² | 2008 | ||
Dubai World Islands Dubai | hotel, new construction | GRAVIMAT | United Arab Emirates, Dubai | 200 m² | 2016 | ||
Maison Duyck | Hotel Brussels | hotel, refurbishment | plaster on gypsum board, acoustic plaster ceiling BASWA Cool | Belgium, Brussels | Architect: Bureau d'Architecture Philippe Cuylits Client: M. et Mme Duyck-De Lathauwer |
369 m² | 2015 | |
Hotel Neuvice Liège | hotel, refurbishment | plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating in screed, floor heating onto screed, wooden or drywall subfloor | Belgium, Liege | Architect: Bureau d'Architectes Stéphane Adam - Michaël Hick Client: Société HÔTEL NEUVICE |
349 m² | 2012 | |
art'otel Berlin Berlin | hotel, new construction | plaster on gypsum board, plaster on concrete | Germany, Berlin | 726 m² | 2001 | ||
Hotel "ADREMA", Extension Berlin | hotel, new construction | plaster on concrete | Germany, Berlin | Architect: PLAN 7 Architekten |
1.058 m² | 2004 - 2006 | |
Old Village School Triebkendorf | hotel, refurbishment | floor heating in screed | Germany, Feldberger Seenlandschaft OT Triebkendorf | 371 m² | 2008 | ||
Grand Hotel Heilgendamm Bad Doberan | hotel, refurbishment | plaster on concrete | Germany, Bad Doberan | 866 m² | 2002 - 2003 | ||
Grandhotel THE FONTENAY Hamburg | hotel, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Hamburg | Architect: Störmer Murphy and Partners GbR Client: Kühne Immobilia GmbH, Hamburg |
2.120 m² | 2016 - 2017 | |
Scandic Emporio Hotel Hamburg | hotel, new construction | jointless drywall ceiling with CTM placed on top | Germany, Hamburg | Architect: Axel Bühring Architekturbüro |
39 m² | 2016 | |
Westin Hotel in the Elbphilharmonie Hamburg | hotel, new construction | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Hamburg | Architect: Herzog & de Meuron |
4.100 m² | 2010 & 2014 | |
Grand Spa Resort A-Rosa Sylt | hotel | plaster on gypsum board | Germany, List | Sylt | 364 m² | 2009 | ||
The Ritz-Carlton in the "VW Autostadt" Wolfsburg | hotel | acoustic plaster ceiling BASWA Cool | Germany, Wolfsburg | 214 m² | 2013 | ||
Gutshof Elbschloss Kehnert Tangerhütte | hotel, refurbishment | floor heating in screed, jointless drywall ceiling with CTM placed on top | Germany, Tangerhütte | 94 m² | 2021 | ||
Me and all Lindner Hotel Düsseldorf | hotel, new construction and refurbishment | plaster on gypsum board | Germany, Düsseldorf | Architect: gna Grimbacher Nogales Architekten GmbH |
2.728 m² | 2015 - 2016 | |
Themenhotel Phantasialand Brühl | hotel | plaster on concrete | Germany, Brühl | 30 m² | 2003 | ||
Stadthaus am Gürzenich Cologne | hotel, new construction | plaster on gypsum board, plaster on concrete | Germany, Cologne | Architect: Architekten Waclaw Bieniasz-Nicholson und John Seifert |
1.082 m² | 2002 - 2003 | |
Parkhotel Quellenhof Aachen (I + II.BA) | hotel | plaster on gypsum board, plaster on concrete | Germany, Aachen | 748 m² | 1999 - 2001 | ||
Schloss Waldthausen Budenheim | Castle | hotel, refurbishment | plaster on gypsum board | Germany, Budenheim | 120 m² | 2002 | ||
Diehl's Hotel Rheinterrassen Koblenz | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Koblenz | 420 m² | 2000 | ||
Sheraton Hotel Airport Frankfurt am Main | hotel | jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | 55 m² | 2008 | ||
New Century Hotel Offenbach | hotel | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Offenbach | 1.030 m² | 2016 | ||
Hotel Schlockhoff Hattersheim | hotel | plaster on gypsum board | Germany, Hattersheim | 506 m² | 2003 | ||
Lindner Hotel Speyer | hotel | plaster on concrete | Germany, Speyer | 107 m² | 2004 | ||
Dorint-Hotel Baden-Baden | hotel | jointless drywall ceiling with CTM placed on top | Germany, Baden-Baden | 319 m² | 2001 |