Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Haecker Metall Pforzheim | office building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Pforzheim | Architect: SCAILAB Fiess Kruse Freie Architekten GbR |
635 m² | 2017 | |
Museum Ritter | Sammlung Marli Hoppe-Ritter Waldenbuch | public building, new construction | floor heating onto screed, wooden or drywall subfloor | Germany, Waldenbuch | Architect: Max Dudler Client: Alfred Ritter GmbH |
395 m² | 2005 | |
Hochschule der BA für Arbeit Mannheim | public building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Mannheim | Client: BI Management GmbH, Nürnberg |
217 m² | 2016 - 2017 | |
ALB 10 Züblin corporate headquarter Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Client: STRABAG Real Estate GmbH |
3.543 m² | 2021 - 2022 | |
LBBW Landesbank Baden-Württemberg Stuttgart | office building, new construction and refurbishment | plaster on concrete | Germany, Stuttgart | Architect: Schaller Architekten BDA RIBA Client: Fünfte Industriehof Objekt-GmbH & Co. KG |
3.083 m² | 2016 - 2017 | |
LSV Landwirtschaftl. Sozialversicherung Stuttgart | office building, refurbishment | near-surface concrete activation, floor heating in screed | Germany, Stuttgart | Architect: Herrmann + Bosch Architekten, Kubus360 GmbH |
21.736 m² | 2002 - 2003 | |
Magirus Immbobiliengesellschaft Stuttgart | office building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Architect: Blocher Partners |
1.914 m² | 2018 | |
Renovation listed multi-family house Stuttgart | residential building, refurbishment | floor heating in screed, plaster on gypsum board, brickwork, concrete | Germany, Stuttgart | Architect: Frey Architekten Stuttgart Client: private person |
70 m² | 2021 | |
Consolar Solare Energiesysteme Lörrach | laboratory | ice storage | Germany, Lörrach | 276 m² | 2018 | ||
New construction Mikroskopgebäude SALVE + TITAN Ulm | laboratory, new construction | gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 | Germany, Ulm | Architect: Mühlich, Finke & Partner Client: Vermögen und Bau Baden-Württemberg |
216 m² | 2017 | |
AHV Mannheim | office building | metal panel | Germany, Mannheim | 753 m² | 2000 | ||
Bauhaus-Zentrale Mannheim | Service Center Mannheim | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Mannheim | 3.670 m² | 2007 | ||
Logistikzentrum Heddesheim | industrial building, new construction | plaster on gypsum board | Germany, Heddesheim | Architect: Krüger Consult GmbH |
1.133 m² | 2012 | |
New construction SFH LI Lampertheim | residential building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Lampertheim-Hofheim | Architect: Dipl.-Ing. Harald Heiser -DBD |
87 m² | 2019 | |
SAP AG building WDF 03 Walldorf | office building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Walldorf | 2.183 m² | 2011 | ||
CEOS GmbH Heidelberg | office building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Heidelberg | 219 m² | 2014 | ||
Credit Suisse Stuttgart | office building | metal panel | Germany, Stuttgart | 129 m² | 2002 | ||
Daimler AG building 136 Werk Untertürkheim | office building, refurbishment | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Germany, Stuttgart | 203 m² | 2016 | ||
Daimler Chrysler building 120 Werk Untertürkheim | office building | metal panel | Germany, Stuttgart | 587 m² | 2006 | ||
Daimler Chrysler building 137 Werk Untertürkheim | office building | jointless drywall ceiling with CTM placed on top, metal panel | Germany, Stuttgart | 300 m² | 2004 | ||
Ernst & Young Stuttgart | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Stuttgart | 2.374 m² | 2000 | ||
Hallesche Health Insurcance Stuttgart | office building | plaster on gypsum board, plaster on concrete | Germany, Stuttgart | 165 m² | 2000 | ||
modernisation single-family house Stuttgart | residential building, refurbishment | plaster on concrete | Germany, Stuttgart | Client: private person |
119 m² | 2021 | |
Züblin Z3 Stuttgart | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top | Germany, Stuttgart | Architect: MHM architects |
2.142 m² | 2012 | |
Siegle + Epple factory II Ditzingen-Heimerdingen | office building | metal panel | Germany, Ditzingen-Heimerdingen | 62 m² | 2005 | ||
Kreisparkasse Waiblingen | Savings Bank | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Waiblingen | Architect: Architektengruppe Kist, Waldmann & Partner |
1.184 m² | 2000 | |
IKK Ludwigsburg | Health Insurance | office building | floor heating in screed | Germany, Ludwigsburg | 114 m² | 2006 | ||
Kreishaus Ludwigsburg | office building, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Ludwigsburg | 411 m² | 2007 | ||
Office building Ziemann Ludwigsburg | office building | plaster on gypsum board | Germany, Ludwigsburg | 1.144 m² | 2006 | ||
Sparda-Bank Tübingen | office building | plaster on gypsum board, plaster on concrete | Germany, Tübingen | 124 m² | 2001 | ||
Robert BOSCH building 101 Reutlingen | office building | metal panel | Germany, Reutlingen | 451 m² | 2000 | ||
Robert BOSCH building 218 Reutlingen | office building | metal panel | Germany, Reutlingen | 356 m² | 2004 & 2006 | ||
Kreissparkasse Geislingen | Savings Bank | office building | metal panel | Germany, Geislingen | 560 m² | 2000 - 2001 | ||
Bildungscampus III Heilbronn | public building, new construction | plaster on gypsum board, plaster on concrete | Germany, Heilbronn | Architect: Auer + Weber + Assoziierte GmbH Client: Schwarz Immobilienmanagement GmbH Neckarsulm |
3.165 m² | 2015 - 2016 | |
Bezirksärztekammer Nordbaden Karlsruhe | office building | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Karlsruhe | 1.246 m² | 2015 | ||
Engelhardt & Bauer Print and Press Karlsruhe | industrial building | metal floating ceiling | Germany, Karlsruhe | 335 m² | 2005 - 2006 | ||
IHK Industrie u. Handelskammer Karlsruhe| CCI | office building | plaster on gypsum board, plaster on concrete | Germany, Karlsruhe | 3.200 m² | 1997 - 1998 | ||
Wendtstraße Karlsruhe Renovation | residential building, refurbishment | floor heating onto screed, wooden or drywall subfloor | Germany, Karlsruhe | Architect: Architekten Reich + Seiler |
203 m² | 2019 | |
Dorint-Hotel Baden-Baden | hotel | jointless drywall ceiling with CTM placed on top | Germany, Baden-Baden | 319 m² | 2001 | ||
Staatliche Kunsthalle Baden-Baden | Art Gallery | public building | plaster on concrete | Germany, Baden-Baden | 112 m² | 2003 | ||
Augenklinik Bruchsal | Ophthalmic Clinic | clinic | plaster on gypsum board, plaster on concrete | Germany, Bruchsal | 199 m² | 2006 | ||
Schwarzwald Modellbahn Hausach | Black Forest Model Railway | public building | metal floating ceiling | Germany, Hausach | 180 m² | 2006 | ||
ENERSYS Donaueschingen | office building | plaster on gypsum board, plaster on concrete | Germany, Donaueschingen | 103 m² | 1999 | ||
KARL STORZ Schulungszentrum | Learning Centre Tuttlingen | public building | plaster on gypsum board | Germany, Tuttlingen | 392 m² | 2016 | ||
Museum Storz Tuttlingen | public building | floor heating onto screed, wooden or drywall subfloor | Germany, Tuttlingen | 482 m² | 2019 | ||
Villa Tuttlingen | residential building | Germany, Tuttlingen | 70 m² | 2018 | |||
Dachausbau EN Rottweil | residential building | floor heating onto screed, wooden or drywall subfloor | Germany, Rottweil | 96 m² | 2019 | ||
Apartment Waldeslust Aichhalden | residential building | plaster on concrete | Germany, Aichhalden | 309 m² | 2019 |