Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Carrefour I & II Blvd. Royal Luxembourg-Ville Haute | office building, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top | Luxembourg, Luxemburg-Ville Haute | Architect: M3 Architectes Client: Fonds de Compensation Luxembourg |
7.150 m² | 2016 - 2017 | |
ELKI Bonn | parent-child-clinic Bonn | clinic, new construction | gypsum board wall with OPTIPANEL 15 | Germany, Bonn | Client: Universitätsklinikum Bonn |
26 m² | 2017 - 2018 | |
KWP Penzing Vienna | social and medical institutions, refurbishment | jointless gypsum board ceiling with OPTIPANEL 15, gypsum board wall with OPTIPANEL 15, plaster on concrete | Austria, Vienna | 1.509 m² | 2017 - 2018 | ||
Showrooms Office Tabuk | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT | Saudi Arabia, Tabuk | 110 m² | 2012 | ||
Universitätsklinikum Marburg | clinic, refurbishment | gypsum board wall with OPTIPANEL 15 | Germany, Marburg | Architect: Universitätsklinikum Gießen und Marburg |
157 m² | 2013 |