Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Forschungszentrum Jülich | Research Centre | laboratory, refurbishment | plaster on gypsum board, plaster on concrete, GRAVIMAT | Germany, Jülich | 297 m² | 2002 - 2003 | ||
Single-family house Valencia | residential building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top, floor heating in screed, GRAVIMAT | Spain, Valencia | 186 m² | 2019 | ||
Showrooms Office Riyadh | office building | GRAVIMAT, plaster on gypsum board, plaster on concrete, gypsum board wall with OPTIPANEL 18, floor heating onto screed, wooden or drywall subfloor | Saudi Arabia, Riad | 420 m² | 2013 | ||
Azzouz Group Aleppo | office building, new construction | plaster on concrete, cooling roll | Syria, Aleppo | 427 m² | 2007 | ||
Clean Room Aleppo | laboratory | plaster on concrete, GRAVIMAT | Syria, Aleppo | 504 m² | 2007 - 2008 | ||
Pharmacy Bünde | public building | GRAVIMAT, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Bünde | 180 m² | 2020 | ||
E.ON AG Düsseldorf | office building, refurbishment | plaster on gypsum board, plaster on concrete, GRAVIMAT | Germany, Düsseldorf | Architect: Oswald Matthias Ungers |
1.211 m² | 2007 - 2008 | |
Umweltamt Sondershausen | Environment Agency | office building, refurbishment | plaster on concrete, floor heating in screed, GRAVIMAT | Germany, Sondershausen | 1.696 m² | 2003 - 2004 & 2006 - 2007 & 2011 | ||
Office Greenwell Design & Build Cairo | office building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Egypt, Cairo | Client: Greenwell Design & Build |
123 m² | 2022 |