Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Core Resorts Hotel Polichrono Chalkidiki | hotel | jointless drywall ceiling with CTM placed on top | Greece, Chalkidiki | Client: Core Hotels Ltd |
87 m² | 2011 | |
Hotel Sans Souci Vienna | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Austria, Vienna | 963 m² | 2012 | ||
Vienna Marriott Hotel | hotel | jointless drywall ceiling with CTM placed on top | Austria, Vienna | 188 m² | 2014 | ||
Hotel Elite Biel | hotel | jointless drywall ceiling with CTM placed on top | Switzerland, Biel | 135 m² | 2005 | ||
Bal Harbour Hotel Miami Beach | hotel | jointless drywall ceiling with CTM placed on top, floor heating in screed | USA, Miami Beach, FL | 344 m² | 2010 | ||
Scandic Emporio Hotel Hamburg | hotel, new construction | jointless drywall ceiling with CTM placed on top | Germany, Hamburg | Architect: Axel Bühring Architekturbüro |
39 m² | 2016 | |
Gutshof Elbschloss Kehnert Tangerhütte | hotel, refurbishment | floor heating in screed, jointless drywall ceiling with CTM placed on top | Germany, Tangerhütte | 94 m² | 2021 | ||
Diehl's Hotel Rheinterrassen Koblenz | hotel, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Koblenz | 420 m² | 2000 | ||
Sheraton Hotel Airport Frankfurt am Main | hotel | jointless drywall ceiling with CTM placed on top | Germany, Frankfurt/Main | 55 m² | 2008 | ||
Dorint-Hotel Baden-Baden | hotel | jointless drywall ceiling with CTM placed on top | Germany, Baden-Baden | 319 m² | 2001 |