Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Revitalisation Wilhelmsplatz 16 Offenbach | residential building, refurbishment | plaster on gypsum board, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, floor heating in screed | Germany, Offenbach | Architect: Gronych + Dollega Architekten |
620 m² | 2017 | |
CHEM Centre Hospitalier Emile Mayrisch Esch-sur-Alzette | clinic, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top, plaster on gypsum board, brickwork, concrete | Luxembourg, Esch-sur-Alzette | Architect: Jim Clemes Associates |
999 m² | 2008 - 2011 & 2014 | |
Carrefour I & II Blvd. Royal Luxembourg-Ville Haute | office building, refurbishment | metal panel, jointless drywall ceiling with CTM placed on top | Luxembourg, Luxemburg-Ville Haute | Architect: M3 Architectes Client: Fonds de Compensation Luxembourg |
7.150 m² | 2016 - 2017 | |
New construction Mikroskopgebäude SALVE + TITAN Ulm | laboratory, new construction | gypsum board ceiling tile, gypsum board wall with OPTIPANEL 18 | Germany, Ulm | Architect: Mühlich, Finke & Partner Client: Vermögen und Bau Baden-Württemberg |
216 m² | 2017 | |
KWP Penzing Vienna | social and medical institutions, refurbishment | jointless gypsum board ceiling with OPTIPANEL 15, gypsum board wall with OPTIPANEL 15, plaster on concrete | Austria, Vienna | 1.509 m² | 2017 - 2018 | ||
Concert Hall Erl | public building, new construction | jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Austria, Erl / Tyrol | Architect: Delugan Meissl Associated Architects |
1.550 m² | 2012 | |
Showrooms Office Tabuk | office building, new construction | plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT | Saudi Arabia, Tabuk | 110 m² | 2012 | ||
Daimler AG building 136 Werk Untertürkheim | office building, refurbishment | gypsum board ceiling tile, jointless drywall ceiling with CTM placed on top, gypsum board wall with CTM | Germany, Stuttgart | 203 m² | 2016 | ||
Von Ardenne GmbH Dresden | New Construction | office building, new construction | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | 1.423 m² | 2013 - 2014 | ||
refurbishment single-family house Ludwigshafen | residential building, refurbishment | jointless drywall ceiling with CTM placed on top, floor heating in screed, plaster on gypsum board, brickwork, concrete | Germany, Ludwigshafen | Architect: Daniel Fischer Ludwigshafen Client: private person |
152 m² | 2021 | |
Office Greenwell Design & Build Cairo | office building, refurbishment | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT | Egypt, Cairo | Client: Greenwell Design & Build |
123 m² | 2022 |