Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Clinique Notre Dame de Grâce de Gosselies | clinic, new construction and refurbishment | jointless gypsum board ceiling with OPTIPANEL 18, jointless gypsum board ceiling with OPTIPANEL 15, jointless drywall ceiling with CTM placed on top, metal panel | Belgium, Charleroi (Gosselies) | Architect: Assar Architects |
3.583 m² | 2012-2014 & 2018 | |
CHU Brugman University Hospital Brussels | clinic | jointless drywall ceiling with CTM placed on top | Belgium, Brussels | 1.274 m² | 2017 | ||
Clinique CHC Montlégia Liège | clinic, new construction | jointless drywall ceiling with CTM placed on top, plaster on concrete | Belgium, Liege | 13.261 m² | 2018 - 2019 |