Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
CHEM Centre Hospitalier Emile Mayrisch Esch-sur-Alzette clinic, refurbishment metal panel, jointless drywall ceiling with CTM placed on top, plaster on gypsum board, brickwork, concrete Luxembourg, Esch-sur-Alzette

Architect: Jim Clemes Associates

999 m² 2008 - 2011 & 2014
Clinique Notre Dame de Grâce de Gosselies clinic, new construction and refurbishment jointless gypsum board ceiling with OPTIPANEL 18, jointless gypsum board ceiling with OPTIPANEL 15, jointless drywall ceiling with CTM placed on top, metal panel Belgium, Charleroi (Gosselies)

Architect: Assar Architects

3.583 m² 2012-2014 & 2018
BDH-Klinik Braunfels clinic, refurbishment metal panel, jointless drywall ceiling with CTM placed on top Germany, Braunfels 1.364 m² 2015 & 2019
Hôpital Lenval Nice Côte d'Azur clinic, refurbishment metal panel France, Nice 134 m² 2021
St. Anna Kinderspital children's hospital Vienna clinic metal panel Austria, Vienna 314 m² 2015 - 2017
University Clinic of Dentistry ZMK BT 1-5 clinic, refurbishment , , new construction metal panel, jointless drywall ceiling with CTM placed on top, plaster on gypsum board, plaster on concrete Austria, Vienna 1.461 m² 2010 - 2013
Wilhelminenspital hospital Vienna clinic metal panel Austria, Vienna 242 m² 2012
Hospital Wiener Neustadt clinic metal panel Austria, Wiener Neustadt 340 m² 2011
Hospital Mostviertel Scheibbs clinic metal panel, jointless drywall ceiling with CTM placed on top Austria, Scheibbs 927 m² 2010 & 2012
Hospital Amstetten clinic metal panel Austria, Amstetten 423 m² 2006
SKA Special Hospital Bad Schallerbach clinic metal panel Austria, Bad Schallerbach 542 m² 2015
PVA Special Hospital Saalfelden clinic, refurbishment metal panel Austria, Saalfelden 906 m² 2014
Myas Clinic & Laboratory Moscow clinic, refurbishment metal panel Russia, Moscow 229 m² 2019
SUVA Klinik CRR Sion clinic, new construction metal panel, plaster on concrete, jointless drywall ceiling with CTM placed on top Switzerland, Sitten 1.856 m² 2014 - 2015
Spital Thusis clinic metal panel Switzerland, Thusis 134 m² 2018
E-HWA Hospital PJT. Asan City, Chungchungnam-do clinic, new construction GRAVIMAT, metal panel South Korea, Asan City, Chungchungnam-do

Architect: Yeoga Architects & Engineers Associates

38 m² 2020
Schüchtermann Klinik Bad Rothenfelde clinic metal panel Germany, Bad Rothenfelde 858 m² 2008
Unfallklinik Murnau clinic metal panel Germany, Murnau 72 m² 2004