Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
WWF Headoffice - World Wildlife Fund for Nature Zeist | office building, refurbishment | plaster on concrete | Netherlands, Zeist | Architect: RAU Architects |
1.398 m² | 2006 | |
McAfee International BV Amsterdam | public building | plaster on concrete, metal panel | Netherlands, Amsterdam | 234 m² | 2011 | ||
Villa Konigslaan Amsterdam | residential building, refurbishment | plaster on concrete | Netherlands, Amsterdam | 308 m² | 2007 | ||
Single-family house Bilthoven | residential building | plaster on concrete | Netherlands, Bilthoven | 213 m² | 2007 | ||
Residential building GRA Opmeer | residential building | plaster on concrete, plaster on gypsum board, plaster on gypsum board, brickwork, concrete, floor heating in screed | Netherlands, Opmeer | 180 m² | 2007 | ||
Vacation home Lunteren | residential building, new construction | plaster on concrete, plaster on gypsum board, brickwork, concrete, floor heating in screed | Netherlands, Lunteren | Architect: Architektenbureau DBL Lunteren BV Client: private person |
292 m² | 2010 | |
Hotel Landgoed Zonheuvel and Conference Center Doorn | hotel | near-surface concrete activation, plaster on gypsum board, plaster on concrete | Netherlands, Doorn | 1.125 m² | 2010 | ||
Utrecht University | public building | plaster on gypsum board, plaster on concrete, plaster on gypsum board, brickwork, concrete, floor heating onto screed, wooden or drywall subfloor | Netherlands, Utrecht | 1.548 m² | 2011 | ||
Single-family house Velp | residential building | plaster on concrete | Netherlands, Velp | 288 m² | 2013 | ||
Priva B. V. De Lier | public building, new construction | plaster on concrete, jointless drywall ceiling with CTM placed on top | Netherlands, De Lier | 393 m² | 2014 |