Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Office Iberian Cosmetic Trading | Calpe office building, refurbishment plaster on gypsum board, GRAVIMAT Spain, Calpe 213 m² 2004
Office building "KST Klimasystemtechnik" Shanghai office building room element, metal panel, cooling roll, cooling column, GRAVIMAT China, Shanghai

Client: KST Klimasystemtechnik Co. Ltd.

2.386 m² 2007
KST cooling convector office building GRAVIMAT China, Kunshan 280 m² 2018
Delegation of the EU to Georgia I Tbilisi office building, refurbishment GRAVIMAT, plaster on gypsum board Georgia, Tbilisi

Client: European Union

802 m² 2004 & 2007
Delegation of the EU to Georgien II Tbilisi office building, refurbishment floor heating onto screed, wooden or drywall subfloor, GRAVIMAT Georgia, Tbilisi

Client: European Union

271 m² 2010 & 2020
Showrooms Office Tabuk office building, new construction plaster on gypsum board, jointless drywall ceiling with CTM placed on top, gypsum board wall with OPTIPANEL 15, GRAVIMAT Saudi Arabia, Tabuk 110 m² 2012
Office Riyadh office building GRAVIMAT Saudi Arabia, Riad 80 m² 2018
Showrooms Office Riyadh office building GRAVIMAT, plaster on gypsum board, plaster on concrete, gypsum board wall with OPTIPANEL 18, floor heating onto screed, wooden or drywall subfloor Saudi Arabia, Riad 420 m² 2013
Azzouz Group Aleppo office building, new construction plaster on concrete, cooling roll Syria, Aleppo 427 m² 2007
Taiba Gold & Jewels Dubai office building GRAVIMAT, jointless gypsum board ceiling with OPTIPANEL 15 United Arab Emirates, Dubai 488 m² 2015
Deutsche Telekom Representative Office Berlin office building, new construction , , refurbishment metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Berlin 1.980 m² 2001
Volksbank Mindener Land Minden office building, refurbishment metal panel, jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Minden 1.980 m² 2012 & 2014
Kreissparkasse Halle Westfalen | Savings Bank office building jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Halle (Westfalen) 1.717 m² 2010-2011
Landwirtschaftsamt Leinefelde office building GRAVIMAT Germany, Leinefelde 63 m²
Capricornhaus | E.ON Energy Trading Düsseldorf office building, new construction jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Düsseldorf

Architect: Gatermann + Schossig

70 m² 2008
E.ON AG Düsseldorf office building, refurbishment plaster on gypsum board, plaster on concrete, GRAVIMAT Germany, Düsseldorf

Architect: Oswald Matthias Ungers

1.211 m² 2007 - 2008
Stadtwerke Herne | Municipal Utilities office building jointless gypsum board ceiling with OPTIPANEL 18, GRAVIMAT Germany, Herne 247 m² 2011
Westfälische Provinzial Versicherung | Insurance Münster office building jointless drywall ceiling with CTM placed on top, GRAVIMAT Germany, Muenster 258 m² 2010 - 2011
Serverroom Company Dieker Garrel office building GRAVIMAT Germany, Garrel 70 m² 2010
DKV Krankenversicherung | Health Insurance Cologne office building GRAVIMAT Germany, Cologne 283 m² 2001
Schäfer Werke Neunkirchen office building GRAVIMAT Germany, Neunkirchen 129 m² 2008
Umweltamt Sondershausen | Environment Agency office building, refurbishment plaster on concrete, floor heating in screed, GRAVIMAT Germany, Sondershausen 1.696 m² 2003 - 2004 & 2006 - 2007 & 2011
Office Greenwell Design & Build Cairo office building, refurbishment plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top, GRAVIMAT Egypt, Cairo

Client: Greenwell Design & Build

123 m² 2022