Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
---|---|---|---|---|---|---|---|
Altkönig Stift Kronberg | social and medical institutions, new construction | plaster on concrete | Germany, Kronberg/Taunus | Architect: a|sh Sander Hofrichter Architekten |
1.071 m² | 2013 | |
Centre Diekirch Assisted Living Diekirch | social and medical institutions | plaster on gypsum board, plaster on concrete | Luxembourg, Diekirch | 1.382 m² | 2010 | ||
KWP Penzing Vienna | social and medical institutions, refurbishment | jointless gypsum board ceiling with OPTIPANEL 15, gypsum board wall with OPTIPANEL 15, plaster on concrete | Austria, Vienna | 1.509 m² | 2017 - 2018 | ||
WZC Sint Truiden Villa Rosa assited living | social and medical institutions, new construction | acoustic plaster ceiling BASWA Cool | Belgium, Sint Truiden | 532 m² | 2014 | ||
Dialyse Centre Berlin I | social and medical institutions, refurbishment | plaster on gypsum board | Germany, Berlin | 788 m² | 2002 & 2006 | ||
Dialyse Centre Berlin II | social and medical institutions, refurbishment | plaster on gypsum board, floor heating onto screed, wooden or drywall subfloor | Germany, Berlin | 211 m² | 2013 | ||
Ärztehaus Düsseldorf | Medical Centre | social and medical institutions | plaster on gypsum board, plaster on concrete | Germany, Düsseldorf | 1.154 m² | 2009 - 2010 | ||
Ärztehaus Köln-Rodenkirchen | Medical Centre Cologne | social and medical institutions | plaster on concrete | Germany, Cologne | 113 m² | 2006 |