Description
The renovation of the Vienna PVA headquarters took place over several years. First, the offices were renovated. More than 2,000 m² of ceiling space was fitted with metal cassettes. This was followed by the refurbishment of the registrar's office with around 400 m² of metal cassette ceiling. In 2014, the conversion of the kitchen and the refurbishment of the WKÜ were realised. In the kitchen, the decision was made to install a jointless gypsum board ceiling with more than 400 m² of capillary tube mats, and in the WKÜ, a metal ceiling with almost 450 m². All heating and cooling systems installed can be used as heating or cooling just as needed.